Solis by Mosaic

32 Maltman Street, Kings Beach

Find our site plan, project timeline and more information below or visit our Facebook page for daily news.

Interactive Site Plan

Hover over the orange hot spots to see plans, renders and more…

Solis features 33 beautiful one, two and three bedroom apartments over eight levels, crowned by three sub-penthouses and two exclusive penthouse apartments. 

Key Community Benefits

Infrastructure Contributions Over $680,000 will be contributed to improve local infrastructure, including roads, parks and stormwater.

Utility Contributions Over $280,000 will be contributed towards local water supply and sewage infrastructure.

Property Market The addition of a boutique project such as Solis will have a positive impact on the local market values through increasing the standard of product offering.

MORE +
This is referring to the property values and the locals within the Coolum market.

6-Leaf Envirodevelopment Award received for sustainable development and outstanding environmental design, judged on excellence in ecosystems, waste, energy, water & community.

MORE +
First development on Sunshine Coast to receive full certification with the second being Drift by Mosaic.

   Employment    Our project pipeline will generate 635 direct and indirect full time equivalent positions, with 400 of those being on the Sunshine Coast.

MORE +
This totals $33 million in wages and salaries for Sunshine Coast workers.

Economic Value Our Sunshine Coast projects will contribute $94 million to the local economy. A further $196 million will be directly and indirectly added to the construction industry.

MORE +
Plus a further $196 million to the construction industry direct and indirect.

Project Timeline

Solis by Mosaic

2018
December 1 2018

FINAL VIDEO UPDATE

September 30 2018

VIDEO UPDATE

July 31 2018

VIDEO UPDATE

June 22 2018

8th COMMUNITY UPDATE

April 30 2018

7th COMMUNITY UPDATE

March 31 2018

VIDEO UPDATE

February 21 2018

CRANE ERECTED

The crane has been erected to facilitate more efficient material loading.

February 14 2018

PODIUM LEVEL

We have now completed 3 concrete slabs including the podium level (ground level) slab!

February 1 2018

6th COMMUNITY UPDATE

January 1 2018

FIRST SLAB POUR

The first concrete slab on ground has been poured at Solis.

Project Completion – November 2018

FAQs From The Community

We have dust suppression systems in place which are high pressure water hoses directed in the areas of excavation to contain and dampen the dust.

We recommend that you close any windows that face the site during the hours of construction, to minimise the amount of dust entering your property.

Currently scheduled for November 2018.

Monday to Saturday 6:30am – 6:30pm. All construction activity will be restricted to these times, with only low impact set-up activities occurring outside these times.

Can’t find the answer you were looking for?

Meet and Contact the Team

Matt Freney

Solis Site Manager

Ellie Watford

Ellie Watford

Community Engagement Assistant

Check out our Facebook page to receive frequent weekly updates

Receive our community updates on e-mail

  • This field is for validation purposes and should be left unchanged.
Mosaic Property Group logo

If your matter is urgent, please contact Ellie Watford on 07 3171 2270 or alternatively, send us a message below.

  • This field is for validation purposes and should be left unchanged.
Mosaic Property Group logo

Send us through your question below and we will get back to you as soon as possible with the answer!

  • This field is for validation purposes and should be left unchanged.

Like us on Facebook for frequent project updates!

If your matter is urgent, please contact
Ellie Watford on 07 3171 2270 or community@mosaicproperty.com.au.

mosaic-professional-associations-logo-bar